01
Kitchens
Most of the peninsula kitchens in this demo are galleys or a back room that never quite reached the garden. We take out a non-bearing wall when the structure allows it, keep the heart pine if it is sound, and build painted inset doors rather than a flat slab that ignores the rest of the house.
Typical site time is 9 to 14 weeks after millwork is in the shop. A temporary kitchen — a sink on the piazza or in a laundry — is part of the scope when the house stays occupied.